FHS Renovation - Q&A (audio)

Question & Answer section following the presentation by Kaestle Boos on the options for renovating Franklin High School. Questions from committee members in order of appearance: Roy, Mullen, Armenio, Trahan, Kelly and Cafasso.

Time: 15 minutes, 0 seconds



MP3 File


My notes from the discussion:

Michael McKean (?) representing Kaestle Boos on the Franklin High School renovation options.
  • approximately 30 months for total renovation
  • approximately 24 months to build a new school keeping the existing field house
  • students will adjust quickly during the construction, the teachers and parents generally have more of an issue adjusting
  • in the renovation options, the traffic flow remains mostly the same other than attempting to separate the parent drop offs from the buses
  • the auditorium would be about $7 million (as sized at 26000 sq foot)
  • all the options would connect on the second level, for brevity of the presentation they were not shown here
  • this is not simply building on the roof as the existing building was done before the current seismic codes were put into place
  • the new building option would locate the building further away from the existing homes