Annual Report Of The Charles River Pollution Control District - FY 2021

Note: FY 2021 is last year (July 1, 2020 to June 30, 2021). The report was prepared to cover the business for the FY 2021 period. This year’s report FY 2022 (July 1, 2021 to June 30, 2022) is in preparation now and is normally available for distribution at the polls for the November election. Updated - 08/15/22

During Fiscal Year 2021, the Charles River Pollution Control District’s (District) regional advanced wastewater treatment facility received and treated approximately 1,693 million gallons (4.63 million gallons per day) of raw wastewater, including 9.6 million gallons of septage from the District’s member and customer towns before discharge to the Charles River.

As part of the District’s infiltration and inflow program, the District inspected the Mine Brook Interceptor Subsystem, which included inspecting 99 manholes, and performing closed-circuit television camera (CCTV) and multi-sensor inspections of 28,400 linear feet of pipe for signs of infiltration and inflow. Repair work is scheduled to be completed during FY 2022.

In late 2015, the District entered into a Power Purchase Agreement to receive net-metering credits from a solar array in Carver, Massachusetts. The array has been online since December 2015 and to- date the District has received over $420,000 in net- metering credits.

The District’s Fiscal Year 2022 budget is 1.9% higher than the previous years’ budget. The District’s FY 2022 budget for operations and maintenance is $3,814,850, while the capital projects budget is $2,262,900. Franklin’s share of the operation and maintenance and capital projects budgets are estimated to be $2,103,960 and $1,272,840, respectively.

For more information on the District please check out our website at https://www.charlesriverpcd.org/.

Respectively submitted

Douglas M. Downing, Chairman (Medway) 
David Formato, Vice Chairman (Franklin) 
Mark Cataldo, Clerk (Franklin)
Michael Callahan (Medway) 
Wolfgang Bauer (Franklin)

Charles River Pollution Control District (CRPCD) Officers:
Elizabeth Taglieri, P.E., Executive Director 
John D. Foster, Treasurer
Barbara Maffeo, Executive Secretary


The full Annual Report for 2021 can be found

The collection of Annual Reports can be found online

Annual Town Report Of The Town Clerk’s Office - FY 2021
Annual Report Of The Town of Franklin - FY 2021

Saturday, June 4, 2022

tests show car tires "produce vastly more particle pollution than exhausts"

"Almost 2,000 times more particle pollution is produced by tyre wear than is pumped out of the exhausts of modern cars, tests have shown. 
The tyre particles pollute air, water and soil and contain a wide range of toxic organic compounds, including known carcinogens, the analysts say, suggesting tyre pollution could rapidly become a major issue for regulators. 
Air pollution causes millions of early deaths a year globally. The requirement for better filters has meant particle emissions from tailpipes in developed countries are now much lower in new cars, with those in Europe far below the legal limit. However, the increasing weight of cars means more particles are being thrown off by tyres as they wear on the road."
Continue reading The Guardian article online (subscription maybe required)
 

Emissions from tailpipes in developed countries are much lower in new cars, with those in Europe far below the legal limit. Photograph: Jacob King/PA
Emissions from tailpipes in developed countries are much lower in new cars, with those in Europe far below the legal limit. Photograph: Jacob King/PA

Tuesday, July 6, 2021

Franklin Annual Report - 2020: Charles River Pollution Control District

ANNUAL REPORT OF THE CHARLES RIVER POLLUTION CONTROL DISTRICT

During Fiscal Year 2020, the Charles River Pollution Control District’s (District) regional advanced wastewater treatment facility received and treated approximately 1,730 million gallons (4.74 million gallons per day) of raw wastewater, including 9.2 million gallons of septage from the District’s member and customer towns before discharge to the Charles River.

As part of the District’s infiltration and inflow program, the District will be inspecting the Mine Brook Interceptor Subsystem. The District will be inspecting 99 manholes, and performing closed-circuit television camera (CCTV) and multi-sensor inspections of 28,400 linear feet of pipe for signs of infiltration and inflow. This work is to be completed during FY 2021.

In late 2015, the District entered into a Power Purchase Agreement to receive net-metering credits from a solar array in Carver, Massachusetts. The array has been online since December 2015 and to-date the District has received over $350,000 in net-metering credits.

The District’s Fiscal Year 2021 budget is 1.9% lower than the previous years’ budget. The District’s FY 2021 budget for operations and maintenance is $3,743,860, while the capital projects budget is $2,217,930. Franklin’s share of the operation and maintenance and capital projects budgets are estimated to be $2,186,750 and $1,286,440, respectively.

more information on the District please check out our website at https://www.charlesriverpcd.org/.

submitted
Douglas M. Downing, Chairman (Medway) 
David Formato, Vice Chairman (Franklin) 
Mark Cataldo, Clerk (Franklin)
Michael Callahan (Medway) 
Richard Johnson (Franklin)

CRPCD Officers:
Elizabeth Taglieri, P.E., Executive Director 
John D. Foster, Treasurer
Barbara Maffeo, Executive Secretary 

The full Annual Report for 2020 can be found online
https://www.franklinma.gov/town-clerk/files/town-franklin-annual-report-2020

Prior Annual Reports can be found online

Franklin Annual Report - 2020: Charles River Pollution Control District
Franklin Annual Report - 2020: Charles River Pollution Control District

Friday, April 27, 2018

Franklin Residents: Charles River Pollution Control District - Volunteer Opportunity

VACANCY- Charles River Pollution Control District

The Town of Franklin encourages residents who are interested in volunteering to apply now. If you have been curious or interested in giving your time, expertise or perspective on behalf of your community, now is an excellent time to get involved.

For more information on the Charles River Pollution Control District please visit the Boards page here: http://www.franklinma.gov/charles-river-pollution-control

To apply please visit the Town's website and fill out the online volunteer form at: http://franklinmaboards.vt-s.net/newcaf.php

Franklin Residents: Charles River Pollution Control District - Volunteer Opportunity
Franklin Residents: Charles River Pollution Control District - Volunteer Opportunity

Saturday, May 13, 2017

ICYMI - Charles River PCD webpage, Grateful Farm plant sale, FHS All Night Party

In case you missed it (ICYMI) from the world of social media, here are some things that caught my eye this week as 'share worthy'

The Charles River Pollution Control District just got a new website! Whether you are on the municipal system or a septic hauler pumps your system, this is where all of your sewage ends up for treatment. Check it out to learn more about what your sewer bill pays for! http://www.charlesriverpcd.org/



Opening day plant sale. Get everything ready for your home gardens. We will be selling vegetable seedlings and herbs. There will be ready to plant seedlings as well as decorative potted plants and hanging planters.
All plants are grown with organic methods so your garden starts chemical free.
Also make great Mother's Day Gifts!




FHS Senior Parents - We are only at 60% paid for the All Night Party. Letters went out on Friday to parents who have not paid yet.
This is NOT a pay it forward event. Lack of family participation directly affects this year's entertainment, prizes and decorations.
Please visit our website at www.fhsallnightparty.com to submit your payment.
You can also send a check to FHS ANP, PO Box 15, Franklin, MA or drop off a check in our box at the high school's main office.
We need to receive all payments by May 19th.
If you have any questions, please send an email to fhsanp@yahoo.com.
Thank you for your attention to this post!

www.fhsallnightparty.com
www.fhsallnightparty.com

Shared from a Facebook post

Saturday, December 27, 2014

Franklin Annual Report 2014: Charles River Pollution Control District

While the Pond St property has been in the news recently with the RFP and intention to sell it, its original use was as the sewer treatment plant for Franklin. Franklin is part of the Charles River Pollution Control District which handles our wastewater treatment.



During Fiscal Year 2014, the Charles River Pollution Control District’s (District) regional advanced wastewater treatment facility received and treated approximately 1,370 million gallons (3.75 million gallons per day) of raw wastewater, including 7.0 million gallons of septage from the District’s member and customer towns before discharge to the Charles River. The volume of waste treated was lower than the previous year due to a decrease in precipitation.

The District is anticipating the renewal process to begin for its National Pollution Discharge Elimination System (NPDES) permit for discharge of its treated wastewater to the Charles River. Under the preliminary draft NPDES permit, the District and the Towns of Franklin, Medway, Millis, and Bellingham will have to maintain an ongoing preventive maintenance program to prevent overflows and bypasses caused by malfunctions or failures of the sewer system and an infiltration and inflow reduction program. In addition, the new limit for phosphorus is being reduced from 0.2 mg/L to 0.1 mg/L in the summer months and a winter limit of 0.3 mg/L is being added.

The District conducted an Infiltration and Inflow Study in 2013, with CDM Smith, to identify areas of the District’s interceptors that will need further investigation and repair. The study modeled flow through the interceptors, groundwater elevations and rainfall data during the spring and summer months (wet and dry periods).

This summer, the District will be investigating the manholes in a portion of its interceptors to determine each manhole’s condition. CDM Smith and staff from the District prepared a 20-year capital improvement plan (CIP) to improve the wastewater treatment facility to meet more stringent NPDES permitting requirements and provide a more reliable wastewater treatment facility at its current capacity.

In July 2010, the District was informed of its acceptance on the Massachusetts Department of Environmental Protection (Mass DEP) Bureau of Resource Protection Calendar Year 2010 Intended Use List for State Revolving Funding (SRF). In order to expedite the designs and proceed with the project in a timely manner, the CIP was divided into three phases (A, B and C).

  • Phase A, which was completed in December 2013, included the replacement of both primary clarifier mechanisms, addition of two screenings washer/compactors in the wet well, primary scum handling improvements, and plant lighting and security improvements.
  • Phase B, the capping of the on-site residuals landfill, was completed in August 2013.
  • Phase C, focuses on improving phosphorus removal, replacing the disinfection system, and extending the life of the facility for an additional 20 years. This phase is currently under construction. It is expected that construction will last about 2.5 years. A District-wide Global Information System was developed as part of this phase to assist with infiltration and inflow reduction requirements.
The District funded Phases A and B with a 20- year State Revolving Fund (SRF) loan of approximately $3.5M for costs associated with bidding, construction, and resident engineering. Phase C costs will be funded through separate SRF loans of approximately $24.5M, which includes bidding, construction, and resident engineering. Ineligible costs (i.e. design of Phase C) for SRF loans will be funded by a General Obligation Bond of approximately $1.95M.

The District is one of seven municipal wastewater treatment plants selected by the Mass DEP to participate in a pilot program that involves energy auditing, assessments for renewable and clean energy possibilities, and support of implementation for energy related projects. The purpose of this pilot program is to reduce the amount of energy used at municipal wastewater treatment plants by 20%, thereby reducing greenhouse gas emissions and saving municipalities money.

The District was granted $847,583 through the American Recovery and Reinvestment Act to install a 20 kW solar voltaic array and two turbo style blowers. The solar panels will produce energy onsite whereas the turbo blowers will provide oxygen to the secondary treatment system using approximately 30% less power than the existing blowers. The District is anticipating a 20% reduction in energy costs from these energy improvements. At this time, the solar voltaic array has produced over 70,000 kw over the last 3.5 years and the turbo blowers are the main source of air to the activated sludge process.

The District’s Fiscal Year 2015 budget is 13.4% higher than the previous years’ budget. The District’s FY 2015 budget for operations and maintenance is $3,151,720, while the capital projects budget is $1,018,300. Franklin’s share of the operation and maintenance and capital projects budgets are estimated to be $1,652,000 and $620,730, respectively.

Respectively submitted
Douglas M. Downing, Chairman (Medway)
William J. Goode, Jr., Vice-Chairman (Franklin)
Alfred H. Wahlers, Clerk, (Franklin)
Paul J. DeSimone (Medway)
Gene Guidi, (Franklin)

CRPCD Officers:
Elizabeth Schreiber, P.E., Executive Director
Emma J. Catalano, Treasurer
Barbara Maffeo, Executive Secretary
Cornetta, Ficco & Simmler, Legal Counsel

Franklin Municipal Building
Franklin Municipal Building

The full annual report can be obtained from the Town Clerk's office (hard copy) or viewed and/or downloaded from the Franklin website here
http://town.franklin.ma.us/Pages/FranklinMA_Clerk/annual/2014report.pdf

Annual reports of prior years can also be found online at
http://town.franklin.ma.us/Pages/FranklinMA_Clerk/annual/


Monday, December 30, 2013

Annual Report 2013: Charles River Pollution Control District (CRPCD)

Continuing the trip through the Franklin Annual Report for 2013, we come to the section on the Charles River Pollution Control District. If you ever wondered why Franklin doesn't have a waste water treatment plant within town like other communities do, this is the reason. Franklin sends its waste water to the plant location in Medway for treatment.

During Fiscal Year 2013, the Charles River Pollution Control District’s (District) regional advanced wastewater treatment facility received and treated approximately 1,600 million gallons (4.4 million gallons per day) of raw wastewater, including 6.5 million gallons of septage from the District’s member and customer towns before discharge to the Charles River. The volume of waste treated was lower than the previous year due to a decrease in precipitation. 
The District is anticipating the renewal process to begin for its National Pollution Discharge Elimination System (NPDES) permit for discharge of its treated wastewater to the Charles River. Under the preliminary draft NPDES permit, the District and the Towns of Franklin, Medway, Millis, and Bellingham will have to maintain an ongoing preventive maintenance program to prevent overflows and bypasses caused by malfunctions or failures of the sewer system and an infiltration and inflow reduction program. In addition, the new limit for phosphorus is being reduced from 0.2 mg/L to 0.1 mg/L in the summer months and a winter limit of 1.0 mg/L is being added. 
CDM Smith and staff from the District prepared a 20-year capital improvement plan (CIP) to improve the wastewater treatment facility to meet more stringent NPDES permitting requirements and provide a more reliable wastewater treatment facility at its current capacity. 
In July 2010, the District was informed of its acceptance on the Massachusetts Department of Environmental Protection (Mass DEP) Bureau of Resource Protection Calendar Year 2010 Intended Use List for State Revolving Funding (SRF). In order to expedite the designs and proceed with the project in a timely manner, the CIP was divided into three phases (A, B and C).
  • Phase A, which has reached substantial completion, includes the replacement of both primary clarifier mechanisms, addition of two screenings washer/compactors in the wet well, primary scum handling improvements, and plant lighting and security improvements.
  • Phase B, the capping of the on-site residuals landfill, is also substantially complete.
  • Phase C, focuses on reducing phosphorus, improving the disinfection system, and extending the life of the facility for an additional 20 years. This phase is currently being designed with bidding scheduled for this fall. Construction is expected to begin in early 2014. A District-wide Global Information System was developed as part of this phase to assist with infiltration and inflow reduction requirements. 
The District funded Phases A and B with a 20-year State Revolving Fund (SRF) loan of approximately $3.5M for costs associated with bidding, construction, and resident engineering. Planning and design costs for these phases were paid from the District’s capital budget. Planning and design costs for Phase C, which are not eligible for SRF loans, will be funded by a General Obligation Bond of approximately $1.95M. The total project cost is still under review and will become more detailed as design progresses. 
The District is one of seven municipal wastewater treatment plants selected by the Mass DEP to participate in a pilot program that involves energy auditing, assessments for renewable and clean energy possibilities, and support of implementation for energy related projects. The purpose of this pilot program is to reduce the amount of energy used at municipal wastewater treatment plants by 20%, thereby reducing greenhouse gas emissions and saving municipalities money. The District was granted $847,583 through the American Recovery and Reinvestment Act to install a 20 kW solar voltaic array and two turbo style blowers. The solar panels will produce energy onsite whereas the turbo blowers will provide oxygen to the secondary treatment system using approximately 30% less power than the existing blowers. The District is anticipating a 20% reduction in energy costs from these energy improvements. At this time, the solar voltaic array is producing energy which is used at the treatment plant and the turbo blowers provide oxygen to the activated sludge process. 
The District’s Fiscal Year 2014 budget is 8.3% lower than the previous years’ budget. The District’s FY 2014 budget for operations and maintenance is $3,033,690, while the capital projects budget is $643,150. Franklin’s share of the operation and maintenance and capital projects budgets are estimated to be $1,771,040 and $386,000, respectively. 
Respectively submitted 
Douglas M. Downing, Chairman (Medway)
William J. Goode, Jr., Vice-Chairman (Franklin)
Alfred H. Wahlers, Clerk, (Franklin)
Paul J. DeSimone (Medway)
Gene Guidi, (Franklin) 
CRPCD Officers:
Cheri R. Cousens, P.E., Executive Director
Emma J. Catalano, Treasurer
Barbara Maffeo, Executive Secretary
Cornetta, Ficco, Simmler, and Vallee, Legal Counsel

Franklin Municipal Building
Franklin Municipal Building


The full annual report can be obtained from the Town Clerk's office (hard copy) or viewed and/or downloaded from the Franklin website here
http://town.franklin.ma.us/Pages/FranklinMA_Clerk/annual/2013report.pdf

Annual reports of prior years can also be found online at
http://town.franklin.ma.us/Pages/FranklinMA_Clerk/annual/

Saturday, February 28, 2009

"We should have plenty of time to adjust rates"

GHS
Posted Feb 27, 2009 @ 11:28 PM

FRANKLIN —

As part of its plan to make $19.4 million worth of upgrades to the district's sewer plant, the Charles River Pollution Control District is asking Franklin - its largest contributor - to pay the bulk of the cost.

Based on flow going into the plant, Franklin owns 67 percent of the plant's capacity, and is expected to pay $2.52 million in fiscal 2010, which is $445,570 more than its share this year.

Town Administrator Jeffrey D. Nutting said he has received mixed opinions about whether Town Council must vote to approve the $19.4 million, 20-year bond that will be needed, or if the district can simply assess users an increased rate. He said he waiting for an official opinion from the state Department of Revenue.

Regardless of how the money will be approved, the work needs to be done, Nutting said, if for no other reason than the daily $25,000 fine the state Department of Environmental Protection would impose for not complying with regulations.

Read the full article on the Charles River plan in the Milford Daily News here

You can view the actual presentation from the Charles River Pollution Control District as given to the Town Council during the February 4th meeting here


Tuesday, July 22, 2008

Water tagged drains

Franklin: water alert

I am finally getting to some photos taken with my new camera enabled phone. It was easy to take the photos. It was another thing to figure out how to get them off in bulk. Took a little time to think about it but then it dawned on me to try to put the card in the printer and see if it came up as a removable drive; it did. yahoo!

Anyway, the photo was taken back in May as Dolores and I walked one Saturday and found these stickers on the drain curbs all around the downtown area. Some are since gone, the glue apparently not enough to hold them.