Monday, May 23, 2016

Franklin Library Board of Directors: Agenda - May 23, 2016

Franklin Public Library Board of Directors Meeting
May 23rd, 2016
7:00 PM
Franklin Municipal Building Room 106


Call to Order
Public Comment
Minutes
Report of Board members
Renovation/expansion update
Policies:

  • Collection Development Policy
  • Meeting Room Policy
  • Bulletin Board Policy
  • Art display/exhibit Policy
  • Patron Behavior Policy


Library Director's report

  • Introduction of Assistant Director
  • Staff Information – Names, positions, job descriptions
  • Status of Youth Services Librarian
  • Staff Meetings and workshops
  • FY2017 Action Plan
  • Monthly Budget Expenditures
  • Website update
  • Relocation update

Agenda items for June 27th, 2016

Adjourn

Friendly reminder that the LIbrary is operating it's normal hours from the temporary location  at 25 Kenwood Circle while the renovations take place for the next year
Friendly reminder that the LIbrary is operating it's normal hours from the temporary location
at 25 Kenwood Circle while the renovations take place for the next year

Sunday, April 10, 2016

Library Book Sale - Saturday, Apr 9

Monique Doyle sent along a photo of the set up prior to the book sale starting on Saturday. This is the last book sale in the regular Library location for some time. The Library closes Monday, Apr 11 to move to its temporary location on 25 Kenwood Drive. It will operate from the temporary location while the main library is renovated and an addition built.

A good summary of the renovation can be found at 02038.com
http://02038.com/2016/04/franklin-library-moving/


photo submitted by Monique Doyle
photo submitted by Monique Doyle

A couple of children were engrossed in pre-reading the books they ended up purchasing with their mother 
Liu Yuan Ming and Lin Yuan Ming at the books sale
Liu Yuan Ming and Lin Yuan Ming at the books sale (photo submitted by Monique Doyle)

The Library renovation proposal was voted on in the October 21, 2015 Town Council meeting
http://www.franklinmatters.org/2015/10/town-council-summary-tif-approved.html


Wednesday, March 30, 2016

Multiple updates on the Franklin Library move to 25 Kenwood Dr

Friday - April 1 - Moving Party

Everyone is invited to our big send-off party at the Franklin Public Library on Friday, April 1 starting at 2PM. 
Join us for cake, games, treats, crafts, directions to the new location and information. There will be drawings for book giveaways for all ages.

Moving Dates

We will be closed from Monday April 11th – Sunday May 1st to relocate to 25 Kenwood Circle

Circulation

Please help us lighten our load. This is the perfect opportunity to check out enough books, movies and cds to hold you over till we are up and running at our new temporary digs. We will be extending the date the items are due until Friday, May 6th. 
Interlibrary Loan will end Friday, April 22nd at 118 Main ST and resume on Monday, May 2nd at 25 Kenwood Circle 
Please change Interlibrary Loan pick up location to another convenient Minuteman library. ( i.e Medway or Millis, or Medfield, Framingham, Dover, etc.) OR wait to place your request after April 22nd. 
Between April 11th and April 22nd (when the library is closed) interlibrary loan items can be picked up at the Franklin Public Library, 118 Main Street between 9 AM – 5 PM on Mondays through Fridays. Please knock on the children’s door entrance for assistance.

Museum Passes

Non-returnable passes for the month of April and May can be picked up anytime before the 11th of April. Tickets to the Southwick Zoo can be purchased at the Circulation Desk for $15.00 each. To pick up passes that have to be returned; Mystic Seaport, Plimoth Plantation, Tower Hill, etc. please knock on the Children’s door entrance.


Book Drop

Book drop will remain open until April 23rd. You can drop off items at 25 Kenwood Circle beginning Monday, April 25th or hang on until Monday, May 2nd when we are up and running.


  • The Library Phone number remains unchanged. 508 -520- 4940



Book Sale – Buck A Book

Get a jump start on Summer Reading. Everything is a $1.00Saturday, April 9th, 9:00 AM – 3:00 PM P (Please hold all donations until May 2nd) Monthly Booksales will resume in May at 25 Kenwood Circle.

All Library services will resume on Monday, May 2nd at 25 Kenwood Circle.

Please check the website for timely updates.
http://town.franklin.ma.us/Pages/FranklinMA_TownLibrary/index


Thank you for your understanding and cooperation.


Franklin Public Library
Franklin Public Library

This was shared from the official Franklin page
http://franklin.ma.us/Pages/FranklinMA_News/02382C34-000F8513

Monday, February 29, 2016

In the Globe: Shrewsbury library renovation, FHS referenced in new schools using technology

The Boston Sunday Globe West edition featured an article on the renovation and expansion of the library in Shrewsbury. Franklin is about to renovate and expand its own library this year.


  • Read the Globe article here (subscription may be required)

http://www.bostonglobe.com/metro/regionals/west/2016/02/26/few-whispers-shrewsbury-library-where-patrons-feel-home/LSTmoIXxhHUxPXiVfsWfUM/story.html



On Saturday, the Globe front page featured an article on the increasing use of technology in new schools. Among the schools mentioned was Franklin High School with several mentions.


  • Read the Globe article here (subscription may be required)
http://www.bostonglobe.com/metro/2016/02/26/new-schools-focus-technology-security-and-informal-classrooms/XSmbjz7bOfh7EJGkhQGQoO/story.html

Students Brad Bedarian (left) and Ross Carboni worked on a robotics project at the modern Franklin High School (DAVID L RYAN/GLOBE STAFF)
Students Brad Bedarian (left) and Ross Carboni worked on a robotics project at the modern Franklin High School (DAVID L RYAN/GLOBE STAFF)

Monday, February 1, 2016

In the News: fund raiser for DeLucia family, libraries are very busy

From the Milford Daily News, articles of interest for Franklin

"An online fundraiser aimed at helping a local family displaced by a house fire last week has already garnered more than $10,000. 
A GoFundMe page was set up last week to benefit the DeLucia family, whose Church Street residence was destroyed in a three-alarm fire Tuesday. The page shows a contribution tally of $12,415 as of Saturday."

Continue reading the article online (subscription may be required)
http://www.milforddailynews.com/news/20160131/more-than-10k-raised-for-family-displaced-by-fire



"With the rise of the Internet, many predicted the end of libraries - that a local institution predicated on the printed word would soon be as outdated as a telegraph office. 
But now, years after web access became mainstream, municipalities in MetroWest and the Milford areas (among them Franklin, Marlborough, Upton, Hopkinton and Mendon) are not looking to shutter their libraries but expand, renovate and even replace them. 
Those who run, study and design libraries said the buildings have kept their relevance by being places for people to meet, take part in programs and learn how to use the electronic devices that access the Internet. 
And, yes, old fashioned books still account for the bulk of materials checked out."

Continue reading the article online (subscription may be required)
http://www.milforddailynews.com/news/20160131/print-is-not-dead-but-libraries-are-changing

rendering of planned Library renovation
rendering of planned Library renovation

Friday, June 5, 2015

Library Renovation Survey - Extended to June 8th

I was kicking myself for not having posted a reminder to participate in the Library Renovation Survey. However, you do have time to do so as they extended the deadline to Monday June 8th.

You can participate in the survey here:

https://docs.google.com/forms/d/1FSTYHj7o65UIZOXQBB3KQIIOX-xF5uG0qeuMRs0wJUI/viewform


Franklin Public Library
Franklin Public Library


Sunday, March 23, 2014

Then and now: Crossway Church

I thought of a new series of photos that I can share here as the occasion arises. As I have been capturing Franklin scenes for some time, a 'this was then' and 'here it is now' comparison would make sense. Of course while walking Saturday, this is the idea that occurred to me!

Back in 2010 the building on Summer St was decrepit and an eyesore.

Crossway Church - 2010
Crossway Church - 2010

Today, it is respectable place of worship

Crossway Church - 2014
Crossway Church - 2014

Their sign on Summer St

Crossway Church - 282 Summer St
Crossway Church - 282 Summer St


For more about Crossway Church, you can visit their webpage -> http://crosswayma.org/
There you can also find photos of the project as the church was renovated ->   http://crosswayma.org/resources/building-project/

Monday, August 1, 2011

"are there enough people who understand the need for a school?"

The Boston Globe West captures the high school building project in part by writing:
The complexity of the current building would make renovations very invasive to the school day, officials said. With 19 different roof lines and walls primarily lined with cinder block, construction workers couldn’t possibly refurbish the school in a discreet manner. 
“We would literally have to rip apart the walls to get to the plumbing,’’ said Sabolinski. 
As the building committee conducted a feasibility study, it discovered that renovations would also prove very costly. In a budget document released to the public in March, the committee revealed that an extensive renovation would cost $97.9 million before state reimbursement. In the same document, the projection for a model school stood at $91.6 million. But the state allocates an additional 5 percent to the total reimbursement of the model school project, which lowers the final town cost to just under $40 million. 
For years the committee debated the renovation-rebuilding quandary, until the scales tipped decidedly last month when the Massachusetts School Building Authority indicated that it would probably invite Franklin to join its model school program. A quasi-independent government agency, the state authority aims to streamline public school building projects throughout the Commonwealth.
You can read the full article here:

Thursday, July 28, 2011

"for a lot of reasons it's the best choice"

Town officials originally thought to make repairs to the high school, which has so many problems that a national school accreditation agency put Franklin on warning status. To make the necessary repairs, workers would need to gut the school as the whole building would need to be brought up to the current building code. 
A new building is expected to be constructed atop the current tennis courts, a baseball field and a softball field, putting the school closer to the football field and track. 
Construction would take two years; renovation would have required four years of work, officials have said. 
School leaders have said a key benefit of a new school would be that students could make use of the existing structure while a new one is being built. 
"I think for a lot of reasons it's the best choice, not the least of which (is) there will be no disruption of the educational process," said Thomas Mercer, chairman of the town's School Building Committee.

Read more: http://www.milforddailynews.com/archive/x1704351515/State-accepts-Franklin-into-model-school-program#ixzz1TOKtr2D9


Tuesday, July 19, 2011

"Presenting a $95 million school will not be perceived well"

A new school is about $4 million more expensive to the town, but is expected to take a shorter time to finish - two years instead of four. Also, because the new school would be built beside the old school instead of within its existing footprint, students will not have to go to class in a building that is being reconstructed. 
"You can't put a price tag on the disruption issue," said Ed Cafasso, a School Building Committee and School Committee member. "It's not worth it." 
The option of building a new school became viable at the end of June, when the Massachusetts School Building Association indicated that it would invite Franklin into the model school program - and therefore reimburse more than half the cost. The state is expected to accept Franklin's decision on July 27 and the town could choose which model school plan to use by Labor Day. 
The field house cannot remain standing under the state model school program because it would need to be renovated and the cost of the repairs would be too expensive under the state requirements, officials said. The idea of saving the field house had been part of earlier discussions.

Read more: http://www.milforddailynews.com/archive/x633527724/Franklin-committee-votes-to-try-for-new-high-school-not-repairs#ixzz1SXkddICP



Wednesday, March 30, 2011

Live reporting - School Building Committee

Kaestle Boos Associates, inc
Daedalus

about 30 people attending (good participation from Council and School Committee)

The meeting is being recorded by Franklin Matters

Committee members (to be filled in later)

The architect normally brings forth three options, tonight we will see a fourth option. The committee makes a recommendation for the MSBA. The MSBA does see all the options and makes a final decision.

housekeeping

Mike McKeon making the presentation

One change to discussion from prior meetings, the space allocated to BICO

Option 1
bus entrance top right of layout as shown in picture

SchBldgComm: Option 1 - overview

small addition for administration to accommodate the entrance
less impact on site

major changes inside the structure
note these are conceptual drawings

SchBldgComm: Option 1 - 1st floor

central space, student commons, open to media center gallery open above (to second floor)
black box theater, cant get a traditional auditorium in the building but did need some space for approx. 400 seats
large courtyard, small courtyard in central entrance space
seating for the black box theater can be folder up and stored in a space along the wall
cafe and kitchen will remain where they are but be heavily renovated
media center important to the culture of the school
field house and gyms will remain in location, structural upgrade for support planned

the upper floor, attempting to bring light into the middle of the building
four clusters on second floor, four clusters on first floor, total of eight clusters

SchBldgComm: Option 1 - 2nd floor

the corridors don't look like much on the drawings but they are complex
one issue being addressed is that the levels are about 30" off, so they are proposing to reconstruct within the existing ceiling to correct the high difference

SchBldgComm: Option 1 - views

no place within the building to hold more than one class (approx. 400 students)

we don't have group areas within the cluster but they are adjacent to it

after a review of the floor plan options, they will review the dollars associated with each and the pros/cons

the lecture space is about 6500 sq ft, about the same size as the small gym

Option 2
adding a fifth tennis court, replace more sidewalks
drop offs same as in #1

SchBldgComm: Option 2 - overview

no small addition for science rooms in this option
the open space remains, but becomes a cafeteria
cluster concepts remain

SchBldgComm: Option 2 - 1st floor

art courtyard shifts from one side to another (by gym)
science moves to the other side (where art was in #1)
main entrance shifts to the main open space as in #1
the current 'main entrance' becomes the 'public entrance'

2nd floor locker room becomes mechanical room

SchBldgComm: Option 2 - 2nd floor

SchBldgComm: Option 2 - views

Option 3
'new building' done before at Westwood high
leaves field house in place, puts a new building on the fields
then takes down the existing building to create the athletic fields

SchBldgComm: Option 3 - lower level

the new building provides more opportunity for levels, going up and down
Panther Way becomes straighter through the property

SchBldgComm: Option 3 - main level

the track and football field would remain
in term of student impact, this is the better option

lower level has cafe and media center, option for outside dining
2 clusters at this level

main level with main entrances also has three clusters
windows to look down into the 'black box' etc. on lower level

SchBldgComm: Option 3 - upper level

upper level has another three clusters (total of eight)
two story space in media center, lots of light

SchBldgComm: Option 3 - views


Dollars

50-58% of the funding will come from the MSBA
encouraged re-use of model designs

(detail copy of estimates found here)

Option 1 - $73,100,000 - Franklin cost = $30,800,000
Option 2 - $96,400,000 - Franklin cost = $40,800,000
Option 3 - $97,900,000 - Franklin cost = $45,600,000
Option 4 - $91,600,000 - Franklin cost = $38,500,000

the page two sheet needs to be considered if you do Option 1

-----
updated

questions to clarify the options
Option 3 vs. 4, why is the site work double?
the model school would go out more into the filled area of the soil closer to the track/football field than Option 3 would be hence the higher removal/remediation cost.

Whitman-Hanson is one of the model school examples
they have a double gym with an elevated track

Option 4 would take us off the time line (not answered yet as to how far)
The renovation options numbers were coming in so high, what else can we do?

Option 1 vs Option 2 is really comparing apples and oranges due to the changes in the center and around the cafe/kitchen

time frame phases differ
24-36 months for option 1 and 2, more like 24 months for options 3 and 4

is customization allowed in the model school program?
yes, especially for the slope of the ground

controls would be put into place to prevent exposure to hazmat issues for the students and school personnel

Plymouth North one of the model schools is fully air conditioned

The model school program  has been wildly popular

Why would they make us do the model school and not allow us to keep the field house?
The construction design would have to be customized so the savings for the field house would be offset

What do we get for $54M for the renovation?
All new MEP, new electrical, HVAC new, elevators,
we have an estimate, I think the estimate is conservative
the model school program has bids in to compare to, we don't know what will be bid on this

pros/cons sheet handed out (to be added later)

what will the operational costs be?
Franklin High is a very efficient building, so the new building will be somewhat more expensive
a smaller building will be more efficient, less space to heat and cool

Option 3 and 4, are smaller foot print and a third floor
the difference space wise is only 20,000 sq ft amongst the four options

sustainable is re-using what you have, compared to a new building, the renovation of Option 1 is definitely more sustainable

8% contingency for renovation projects, so you may use 5 of it
new custom design carries 5%, and you may use 3% of it
with the model school, it is already been built so the contingency is usually carried at about 3%

the recent bid projects have been coming in under budget

$200-220/ sq ft for renovations, and $260/ sq ft for new constructions
the model schools tend to get more competitive bids (Natick and Norwood recent examples)

Option 3 and 4 cost include the abatement and demolition of the existing building

Jeff Nutting handed out a projection on what it would mean to the taxpayers
level funded as opposed to a higher burden in year one and declining over the terms

the average tax bill would be $230 for a $35M value and $260 for a $40M
the difference is $30/year between a brand new building and a renovation

What is the process for the committee to proceed?
There is no decision being made tonight, I would like to get a consensus from the committee on where to go from here. With the model school option before us, it would be wise to visit one or two of the schools. Get back together again in 3-4 weeks, to come to a decision on which option to recommend for MSBA.

Realistically Option 3 is not likely to be selected
per architect Option1 fits the FHS program better than Option 2

They actually put together the Option 2 first, then after seeing the sticker prices, backed into Option 1

Is there a preference in running the building between 1 and 2?
2 fits the program the best per the FHS
Option 3 and 4 are quicker with no disruption

Classroom sizes are currently smaller than the MSBA requirements, going with the new building we would get larger class rooms

Prior to this week, they were on the agenda for May, likely to be pushed off to July, this would not affect a fall vote. Will give enough time to prepare the due diligence for the presentation to MSBA

Propose to put Option 3 aside
Look at adding from sheet 2 to Option 1 to come up with an Option 1, Option 1.5, Option 2 and Option 4
the sheet 2 stuff are aesthetics and outside grounds

Whitman-Hanson, Hudson, Ashland

You need to bring three options to MSBA and give a recommendation
one of the options may be mute, but there is no negotiation with the MSBA, they will just pick an option

issue with parking, a long walk from the parking
limited with where we could go due to the land adjacent

a more details document of the pros/cons would be needed by the MSBA
the entrances we have been highlighted for students
the public would still maintain the entrances in the front or through the field house

if going to the black box for a performance, I would come in through the front and walk through the corridors not seeing much of where the money went

There is some negotiation even with the model school option after the MSBA has picked
model school is structured more to the enrollment

These numbers are still preliminary!

5 districts have chosen the Whitman-Hanson model, only 1 chose Ashland, 2 chose Hudson

MSBA starts with the ed-spec, then gets into the discussion on scope and site work (can't be more than 8% for site work)

SchBldgComm: Inside entrance Option 1

the goal of all the options was to achieve the same program (visioning exercise)

presentation portion is now complete, closing up

The document handouts from this meeting can be found here:
http://franklinmatters.blogspot.com/2011/03/school-building-committee-documents.html


Franklin, MA


Thursday, January 27, 2011

"Specific costs have yet to be determined"

The plan creates eight clusters which each have four classrooms, a group project room, science lab and space for teachers to provide individual instruction, said Michael McKeon, of Foxborough-based Kaestle Boos Associates.
"These clusters or teams actually have all the services they need within the cluster to support that learning group, which is actually a very advanced or modern way to organize a school," he said.
Two clusters would be reserved for freshmen, who are already grouped for most classes, and one would be for a pre-existing arts academy. The remaining clusters would be for sophomores, juniors and seniors who would be grouped by interests with faculty who share those interests, Principal Peter Light said.
"What you're trying to do is make the school a little smaller for students," Light said. "When you provide them a home base and smaller learning community you actually boost student achievement."
You can read the full article in the Milford Daily News here



Franklin, MA

Saturday, January 15, 2011

"We hope to put as much green into the project as is financially feasible"

Boulter was one of about 35 students who explored the pros and cons of solar panels, geothermal heating, green roofs and ways to improve bathrooms with low-flush toilets, automatic hand driers and motion-activated faucets at an event at the school yesterday.
"All of these things we're seeing on projects," said Christopher Alles, a project manager at the School Building Authority, mentioning the school's coming upgrades. "This gets students thinking about green design."
Students rarely take such an active role in researching such ideas, Alles said, with parents, town officials and administrators normally proposing them.
While concepts such as geothermal heat may not be possible in Franklin, project designers are considering some of the students' proposals, including making bathrooms more environmentally friendly, Town Administrator Jeffrey Nutting said.
I love this collaboration. This is a great practical educational opportunity. Read more about the student work in the Milford Daily News here


Franklin, MA


Sunday, December 12, 2010

"feel like there's a sense of connectivity"

Foxborough architectural firm Kaestle Boos Associates is expected to present three plans to school and town officials in the spring that incorporate items from the recent three-day visioning meeting, Superintendent Maureen Sabolinski said.
"We spent a lot of time talking about what goes on in the classrooms and what is the best learning environment in a Franklin High of the future," Sabolinski said. "We understand that the scope of the project is not going to be a new high school. We were really looking at a renovation of the current space."
The group concluded that education would be more collaborative and project-based if there were many common areas for students and teachers to work together on projects, as is typically done in college settings, Sabolinski said.


Architects get to work on vision for renovated Franklin High School






Franklin, MA


Saturday, August 7, 2010

"officials don't have an estimate for the cost of renovations"


Renovating the science lab is a top priority educationally, according to Light. He also pointed to the auditorium as an area that could use work.
Light said auditorium seating predates the rest of the school by about a decade, and was salvaged from a town middle school. The stage is not handicapped-accessible. Some eight feet behind its curtain, there's a large cement wall.
"The renovation is more about the core of the building," Director of Facilities Mike D'Angelo said. "It's built to educate kids in 1971. It's not built to educate them in 2010."
 Read the full article about the tour of Franklin High School by local and state official in the Milford Daily News here:
http://www.milforddailynews.com/news/x1799252551/Officials-tour-Franklin-High


Franklin, MA


Tuesday, August 3, 2010

Plans for schools advance

 
 

Sent to you by Steve Sherlock via Google Reader:

 
 

via Boston Globe -- Globe West by Rachel Lebeaux, Globe Correspondent on 7/31/10

As the new school year approaches, officials in Franklin and Medway are on the verge of hiring architects for longstanding school renovation and repair efforts, and are moving closer to asking voters to approve property-tax increases to pay for the projects.

Add to Facebook Add to Twitter Add to digg Add to StumbleUpon Add to Reddit Add to del.icio.us Email this Article

Medway - Franklin Massachusetts - Property tax - Business - Franklin

 
 

Things you can do from here:

 
 

Tuesday, April 6, 2010

"schools will be eligible for about 50 percent reimbursement"

The School Building Authority will also visit Franklin's Tri-County Regional Vocational Technical High School today to look at problems with their hot water and air conditioning systems.
Superintendent-Director Barbara Renzoni said upgrades to those systems could cost a minimum of $350,000.
"I was just (on the roof) looking at the (water storage tanks) and they are all corroded and rusted and leaking," she said.
Both systems are at the end of their life cycles at 33 years old, said Renzoni. The systems are original to the building, she said, and the school has been "nursing them along" for the past few years.
The school's two 250-ton air conditioner "chillers" are so old that they are difficult to fix because their parts are rare, said Renzoni. The refrigerant the chillers use has recently become regulated by the Environmental Protection Agency, Renzoni said.
"Contractors are now obligated to disclose how and why they're using it, and the quantity (we use) would not be acceptable," she said.
Renzoni is hoping the School Building Authority can help offset the cost of these capital projects.
"And because Tri-County is sensitive to the 11 member towns' fiscal constraints, the school is only asking the towns for their minimum contribution to the school, which is a number the state determines," said Renzoni, "it further enhances our need for assistance."
Read the full article in the Milford Daily News here

Franklin, MA

Thursday, January 28, 2010

In the News - high school renovation planning moves along

Take a step at a time and you make progress towards your goal. With the selection of a project manager, one that has worked with the Town on other major projects (Fire station, Senior Center, etc.), the next step is to select an architect.

Franklin inches closer to renovating high school

from The Milford Daily News News RSS





Tuesday, October 13, 2009

Live reporting - FHS building update

2. Guests/Presentations

a. FHS Building Update – Tom Mercer
Process much different now from last one completed (the Horace Mann project)

Right now at the stage for the feasibility study for the building and grounds. Now on the listing for projects approved for a feasibility study.

First step in this is to hire an OPM. An Owners Project Manager is hired by Franklin. The OPM has to e qualified and certified by the State.

The Request for Services (RFS) was just submitted last week. It had been a revision cycle with the State going back and forth to come to an agreement on the language being used in the document.

Franklin has used OPM's previously for the Senior Center, Fire Station and other projects.

The RFS proposals are due about the end of October, they need to be reviewed, decision made, in conjunction with the State. Likely to have the OPM in place in January when all is said and done.

Once the OPM is completed, another RFS is to be negotiated and submitted to obtain an architect. The architect will then prepare a schematic design. The conceptual design would arrive at the feasibility concept. The design would be submitted to the State which would then review it and detail what they would cover and what they would not cover. If the State does not cover an item, but it is needed, then it would be up to the Town to fund that part of the project at 100%. The State reimbursement rate for the covered items would range from 30-45%. We won't know for sometime where we fall in that range.

To get through the schematic design the Town has authorized a $1 million bond. This is different from prior projects but also a result of the State changes. We may not need to spend the whole amount but we need to front the project funding.

Once the final determination is made on the cost of the project, the Town has 120 days to determine if it approves funding the project. The funding would come from a combination of sources, the primary being a debt override.

After the funding is complete, the OPM and architect would be retained for another period to complete the detailed project determining the final details, including color of the materials. The bids for material would be put out for vendors to submit their proposals to supply the materials.

We thought we would have the RFS out on the street about 3 weeks ago and it is just going out now. OPM on board in January, architect in April, schematic design could be done in the fall. Could go to the voters either in the Fall of 2010 or Spring of 2011.

6-8 months process for the architect to draw the final plans. Hopefully to begin doing some construction work in the fall of 2011 or spring of 2012.

Q - one thing you didn't mention is that the sales tax revenue at the state level, if it continues to fall short, this time line is still open.
A - The only thing approved at this point is the schematic design process, when it comes time to submit it for approval, we won't know what the amount will be, what amount (at the state level will be available) and where we are in the listing.

Q -  If the money is not there, is it a prioritization?
A - Based upon what they have done, you would not get approved unless there was money to cover.

Q - If there is not enough money at the State, do we just wait?
A - It would be a Town Council decision on funding, I wouldn't want to speak for them. The SBA has seen the building and made recommendations, that is on our favor. There are items that I feel they will not approve but that we will want to continue with.

Q -
A - I think we will have multiple options. I think we can do some of the most interruption during the summer time. Some construction will be done during the school year. This is one of the major parts of the planning phases.

Q - Could we use the drawings done a couple of years ago?
A - We did submit those previously. That is one of the reasons, they sent out their engineers to see the building. We will meed the SBA somewhere in the middle. We really can use them as drawings, they were ideas and reflections of what could be.