On Saturday, July 13 the railroad crossing was under construction on
Beaver St resulting in road closure, a shuttle for the MBTA train and detours. What does the repaired crossing look like?
 |
Beaver St railroad crossing |
It looks a lot smoother than it did before. Has the ride over the crossing been smoother?
No comments:
Post a Comment