Facilities
- Transfer/Recycling Center improvements when land transfer complete
Citizens committee had been driver of this
- Review Police Station space - Commence study in 2019
police station was built in 91, current use has outgrown space, dispatch center will take some use, need architect to determine need and plan for redesign, perhaps a small addition, reconfiguring space internally
- Future of Red Brick School - Charter School pulled building permit.
- Future of Old South Meeting House
no real valid use for the facility currently
maintain for time being, unless someone has a use for it
- Implement Preventative Maintenance (PM) for Facilities
Keller Sullivan sprinkler head prior time will spill dirty water
Library spilled clean water
cold weather protocol costs for heat but is better than a pipe burst
custodial staff has lots of coverage late and weekends
2 of the last 3 breaks happened while facilities personnel were standing there
both dry and wet systems, mostly per code requirements
DPW
- Road Funding
- Fund sidewalk plan for Beaver Street and Washington Streets
Washington St from 495 to Coles
looking to follow the sequence defined in the Master Plan
- Finalize and begin to implement Bike lane plan
i.e. Pond St shift of lines to create a lane where it makes sense
Pleasant, Chestnut, Pond, streets to connect to the center of town
- Water - Continue Water line replacement plan, Water Treatment Plant, Water Tanks, other improvements
in mediation
- Continue sewer system improvements
- Future of Beaver Street interceptor
- Storm Water Plan - Potential fee?