Showing posts with label lane closures. Show all posts
Showing posts with label lane closures. Show all posts

Saturday, July 25, 2026

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, July 27 through Friday July 31

RT. 140 (West Central Street) Lane Closure Alert: Monday (7/27) - Friday (7/31) 7 AM to 3 PM

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, July 27 through Friday July 31
Starting Monday, 7/27, the contractor will work along the Route 140 gutter line to repair the pavement and driveway aprons. The work will be contained within the southbound lane from Burger King to Beaver Street. During this time, lane closures will occur as needed on this section of RT. 140. Please use caution when traveling in this area and follow all posted signs.

Pond Street Easement - No Traffic Impact

Starting Tuesday, 7/28, through Thursday, 7/30, a second contractor will line a sewer manhole within the Pond Street Easement.  There will be no traffic impact for this work.

For all the info on the project visit the projec page -



Saturday, June 27, 2026

Beaver St Interceptor (BSI): Construction Updates ~ Monday, June 29 through Wednesday, July 1

RT. 140 (West Central Street) Lane Closure Alert: Monday (6/29) through Wednesday (7/1) 7 AM to 3 PM

Beaver St Interceptor (BSI): Construction Updates ~ Monday, June 29 through Wednesday, July 1
From Monday, 6/29 through Wednesday, 7/1, the contractor will install the sewer force main between Burger King and Dunkin Donuts.  During this time lane closures and shifts will be in place as needed. Please use caution when traveling in this area and follow all posted signs.

From Tuesday, 6/30 through Wednesday, 7/1, a second crew will reinstall sidewalks within RT. 140 (West Central Street)

The work will be contained within the southbound lane from the area near Elizabeth's Bagels to Beaver Street. During this time, lane closures will occur as needed on this section of RT. 140. Please use caution when traveling in this area and follow all posted signs.

NO WORK JULY 2 thru JULY 5 - HAPPY 4th of JULY



Sunday, June 14, 2026

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Saturday, June 13 through Friday, June 19

24/7 Beaver St Road Closure: Saturday, June 13 – Monday, June 15

Starting at 12:00 AM on Saturday, June 13, Beaver Street will close at the MBTA train tracks. This area will remain closed 24 hours a day until Monday, June 15, at 4:00 PM. A detour will be in place during this time.

Access Details:

- Via Rt. 140 only: Access to 242 through 290 Beaver Street, including Franklin Glass, and Franklin Recreation.
- Via Grove St. only: Access to all other locations on Beaver Street, including the Town of Franklin Recycling Center, Beaver Street Recreation Area, and businesses on Master Drive.


MBTA Service Notice:

MBTA Commuter Rail service to Forge Parkway and Dean College (Downtown) Stations will be suspended on Saturday, June 13, and Sunday, June 14.

June 14 - Eddie Grant Kickball Tournament:

For attendees of the Eddie Grant Kickball Tournament on June 14th, please note that you will need to access the Beaver Pond Recreation Area via Grove St. See their Facebook Page (https://www.facebook.com/p/Franklin-Fathers-61580257836187/) for more information. 


RT. 140 (West Central Street) Lane Closure Alert: Monday (6/15) through Friday (6/19) 7 AM to 3 PM

The contractor will reinstall sidewalks within RT. 140 (West Central Street). The work will be contained within the southbound lane from Burger King to Beaver Street. During this time there will be lane closures on RT. 140. Please use caution when traveling in this area and follow all posted signs.

Beaver Street Lane Closure Alert:  From Tuesday (6/16) through Wednesday (6/17) between 7 AM and 4 PM.

The contractor will work on Beaver Street near the MBTA tracks.  During this time there will be a lane closure on Beaver Street around this area.  Please use caution when traveling in this area and follow all posted signs.

For additional updated on the Interceptor project - https://ma-franklin.civicplus.com/557/Beaver-Street-Interceptor-BSI-Project

Monday, June 8, 2026

Beaver Street Interceptor (BSI) Project: Lanes closures this week, Beaver St closed on weekend (at MBTA tracks)

Construction Updates ~ Monday (6/8) through Monday (6/15)

RT. 140 (West Central Street) Lane Closure Alert: Monday (6/8) through Friday (6/12) 7 AM to 3 PM.
The Contractor will be working on resetting curbing and sidewalks within RT. 140 (West Central Street). The work will be contained within the southbound lane from Burger King to Beaver Street. During this time there will be lane closures on RT. 140. Please use caution when traveling in this area and follow all posted signs.

Beaver Street Lane Closure: Tuesday (6/9) – Thursday (6/11)
From Tuesday (6/9) through Thursday (6/11) between 7 a.m. and 4 p.m., the contractor will work on Beaver Street near the MBTA tracks.  During this time there will be a lane closure on Beaver Street around this area.  Please use caution when traveling in this area and follow all posted signs.

24/7 Road Closure: Saturday, June 13 – Monday, June 15
Starting at 12:00 AM on Saturday, June 13, Beaver Street will close at the MBTA train tracks. This area will remain closed 24 hours a day until Monday, June 15, at 4:00 PM. A detour will be in place during this time.

Access Details:
- Via Rt. 140 only: Access to 242 through 290 Beaver Street, including Franklin Glass, and Franklin Recreation.
- Via Grove St. only: Access to all other locations on Beaver Street, including the Town of Franklin Recycling Center, Beaver Street Recreation Area, and businesses on Master Drive.

MBTA Service Notice:

MBTA Commuter Rail service to Forge Parkway and Dean College (Downtown) Stations will be suspended on Saturday, June 13, and Sunday, June 14.

June 14 - Eddie Grant Kickball Tournament:
For attendees of the Eddie Grant Kickball Tournament on June 14th, please note that you will need to access the Beaver Pond Recreation Area via Grove St. See their Facebook Page for more information.