Wednesday, February 27, 2008

Pictures from the FHS presentation

Option One - the new auditorium and science wing would be added to the right of the existing facility

Option Two - the auditorum would be added to the right (as in One) but the science wing would be added to the left

Option Three - the auditorum and entrance would be re-done up front, the science wing wold be added on the right and more would be done in the central sections of the building

This a rendering of what the new school would look like from the air above Oak Street for Option Three

This rendering depicts the new school option building on the left of the existing field house, coming into the tennis courts and baseball/softball fields (but not to the new track). The fields used in this new building option would be relocated to the space where the old building stands now (after it was torn down).

No comments:

Post a Comment