Showing posts with label King St. Show all posts
Showing posts with label King St. Show all posts

Thursday, August 27, 2009

New turn available at King/140

There is a new left turn/drive straight lane alongside a right turn only lane when you travel King Street approaching 140.

This picture shows the lane markings with no cars blocking the view (yes, a lucky bit of timing).



An even luckier bit of timing shows this picture with a red light for the King St traffic. The right lane is making a right turn as the West bound 140 traffic is turning on to King St while the East bound 140 traffic is sitting at their red light.



The pedestrian and traffic light island was shortened to widen the intersection allowing the three lanes (one going out King St to i495, and the two lanes heading from King towards Chestnut St).

This is part of the traffic preparations for the Walgreens to open on the corner later this year.

Tuesday, July 21, 2009

King St and I495 Construction

From the MassHighway website, this is the project description for the I495 and King St intersection construction work underway.

FRANKLIN- RECONSTRUCTION ON KING STREET AND I-495 RAMPS
This is a safety and traffic improvements project. It extends along King Street from Union Street to Upper Union Street and also includes Upper Union Street from King Street to Constitution Boulevard and all four I-495 ramps at King Street. It involves roadway improvements as well as intersection signalization improvements.

Project includes widening of King Street to provide two lanes in each direction with left and right turning lanes at appropriate locations; widening and realignment of Upper Union Street to make Constitution Boulevard the major traffic movement; upgrading the signals at the King and Upper Union Street intersection and providing two left turn lanes from King Street onto Upper Union Street.

New signals will be installed at the intersections of I-495 southbound and northbound ramps, and the signals at the King and Union Street intersection will be upgraded. The signals along King Street will be synchronized to provide better traffic flow along King Street.

Existing concrete pavement will be removed from all four I-495 ramps and ramps will be reconstructed with full depth asphalt pavement. In addition, project involves drainage improvements, curbing, new sidewalks, wheelchair ramps, pavement markings, signing, landscaping, a closed circuit television camera for traffic monitoring on I-495, and other incidental work. This project will require temporary and permanent easements for its implementation.
You can find this on the MassHighway web site here. Select Franklin to see the current project status. Project 602962. By the way, it also shows completed projects.

Note: Like most State websites, the performance is better with IE than Firefox.

Saturday, March 7, 2009

oh no, the start of a sink hole! and King Street was just recently redone

Found on King St heading towards RT 140, between Summer St and Summer St.

I'll come back later to try and measure how deep it is.



Updated 3/8/09 - I did measure it and it is 8" deep, deceiving but potentially dangerous.

Monday, October 20, 2008

King St - construction progress

Time is flying. Haven't taken a snapshot in awhile and the construction has moved quickly along in the meantime.

Franklin: King St progress

There is a Creative Commons license attached to this image. AttributionNoncommercialShare Alike

This would be numbered 190 or 192 King St.

Sunday, October 5, 2008

First floor

The new foundation for the house to be numbered either 190 or 192 King Street is getting the first floor laid down.

King St: foundation complete, flooring being laid


There is a Creative Commons license attached to this image. AttributionNoncommercialShare Alike


Enjoy!

Saturday, September 20, 2008

Another foundation!


Another foundation!, originally uploaded by shersteve.

Yes, for all the talk of the economy in dire straits, there is a new foundation on King St between 188 King (under construction) and 194 King (recently renovated).

Monday, September 1, 2008

188 King St - progress


188 King St - progress, originally uploaded by shersteve.

The progress is significant.

Prior pictures can be found here and here.


Sunday, August 17, 2008

In the news - King St/I495 construction, storyteller at library

King Street work slated at long last
By Rachel Lebeaux
Globe Correspondent / August 17, 2008

A long-awaited overhaul for busy King Street in Franklin has received an injection of state funds that will allow the project - offering improved traffic flow, better signals, and enhanced vehicle, pedestrian, and bicycle safety - to move forward next spring.

The state Transportation Improvement Program has allotted $3.8 million in state and federal funds toward the project, which focuses on upgrades to the Interstate 495 ramps at King Street. Work will extend along King Street from Union Street to Upper Union Street, and include construction on Upper Union Street from King Street to Constitution Boulevard.

The project is slated to go out for bid this fall, with construction starting next spring. Robert "Brutus" Cantoreggi, director of Franklin's Department of Public Works, said he expects construction will last 18 months. While there are likely to be delays, the roads involved in the project will remain open, he said.

The project is aimed at reducing traffic congestion and improving safety measures at several bustling intersections along King Street and at Interstate 495.

Read the full article in the Boston Globe here

--------------

FRANKLIN -

On Tuesday, Aug. 26, the Franklin Public Library is hosting Carolyn Martino, professional storyteller, actress, writer and educator at 7 p.m. in the Meeting Room.

"Enjoy the musical rhythms and joyous logic of all that is Italian in a Bella Notte of Italian storytelling as Martino captures you with her humor, warmth and style,'' says Margaret Ellis, the library's literacy coordinator.

This program is funded by the Massachusetts Board of Library Commissioners with funds from the LSTA, a Federal source of library funding provided by the Institute of Museum and Library Services.

Originally published in the Franklin Gazette on Friday August 15, 2008.


Saturday, August 9, 2008

Franklin changes

Go away for a few days and upon return to Franklin you can find some changes.

A new foundation is being put together for a house in an empty lot on King St:

Franklin: Foundation on King St

There is a Creative Commons license attached to this image. AttributionNoncommercialShare Alike


Work on the columns at the old Town Hall, new museum resumes downtown:

Franklin: Column work resumes

There is a Creative Commons license attached to this image. AttributionNoncommercialShare Alike


And quite a stir is being raised over some feral cats. The article appeared yesterday in the Milford Daily News and got picked up by the Boston Globe today.

Tuesday, June 17, 2008

King Street - sidewalk detour reasons gone


When King Street was re-done, the sidewalk took a turn to go around two stately trees.

Alas, the trees are no longer.

The sidewalk however, still makes the curve around what used to be.