Saturday, December 30, 2023

Prospect St emergency repair requires street closing beginning Jan 3, 2024 for several days

Prospect Street Emergency Repair Update:
After careful evaluation of the existing condition of the old granite culvert and working with Engineering and the contractor it makes sense at this time to completely remove the whole granite culvert and replace it with a new 48" concrete pipe.
In order to do this, Prospect Street will have to be closed for a couple of days. Even though this presents a long significant detour (not kidding no easy away around this work) either through Franklin (think Grove St) or Bellingham (126?) it is the safest and most cost effective way to make the repairs.
It is anticipated at this time Prospect St will be closed the morning of January 3rd and hopefully reopen in seven to ten days, weather permitting.
Prospect St emergency repair requires street closing beginning Jan 3, 2024 for several days
Prospect St emergency repair requires street closing beginning Jan 3, 2024 for several days



No comments:

Post a Comment