Saturday, October 17, 2026

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, Oct. 19 through Friday, Oct. 23

Grove St (Rt. 140 to Beaver St) Road Closure Alert: 
Monday (10/19) through Friday (10/23) 7 AM to 4 PM
Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, Oct. 19 through Friday, Oct. 23


Monday (10/19) through Friday (10/23) between 7 AM and 4 PM, the contractor will work on sewer main installation in the area of 20 Grove St. 

During this time Grove St will be closed to all traffic in both directions. Traffic will follow detour signs on Beaver St to Rt 140. 

Local traffic only will be permitted beyond the road closed signs. 

Please use caution when traveling in this area and follow all posted detour signs.