Showing posts with label lift station. Show all posts
Showing posts with label lift station. Show all posts

Saturday, August 29, 2026

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, August 31 through Friday September 4

West Central Street (Near BJ's) Lane Closure Alert: Monday (8/31) through Friday (9/4) 7 AM to 4 PM

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, August 31 through Friday September 4
Starting Monday (8/31) through Friday (9/4) between 7 a.m. and 4 p.m., the contractor will work on the elevated sewer along West Central Street.  During this time there will be a lane closure on West Central Street between 99 Restaurant and BJ's.  

Traffic leaving BJ's and the Conlyn Avenue area will be detoured onto Forge Parkway to access Rt. 140.  Please use caution when traveling in this area and follow all posted detour signs.


If you haven't viewed the inner workings of the pump/lift station at Beaver St, you are missing out. This was about $8M worth of the toal $30M project



Sunday, May 10, 2026

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday (5/11) Through Tuesday (5/12), 7 AM to 4 PM

Beaver Street Pump Station

At the Franklin Recreation Center, construction of the new Beaver Street Interceptor Pump Station will continue with the installation of the water service into the building.  The work will be contained within one lane on Beaver Street.  During this time there will be a lane closure on Beaver Street between 7am and 4pm. Please use caution when traveling in this area and follow all posted signs.


Please reference the interactive map and posted signs for details and updates.




Teaser: Franklin TV and Franklin Matters took the opportunity to get inside of the Pump Station to take a tour and record the video so you will all be able to see what cost approximately $8M of the overall $33M project. The video will take time to edit so stay tuned for an informative inside view.