Beaver Street Lane Closure Alert: Monday (7/20) through Friday (7/24) 7 AM to 4 PM
Starting Monday July 20, through Friday, July 24, the contractor will be working on Beaver Street installing and testing the sewer force main. During this time the following detour will be in place:
Access Details:
- Via Rt. 140 only: Access to 242 through 290 Beaver Street, including Franklin Glass, and Franklin Recreation.
- Via Grove St. only: Access to all other locations on Beaver Street, including the Town of Franklin Recycling Center, Beaver Street Recreation Area, and businesses on Master Drive.
Note that lane and street closures may change as the work progresses so please use caution when traveling in this area and follow all posted signs.
RT. 140 (West Central Street) Lane Closure Alert: Monday (7/20) - Wednesday (7/22) 7 AM to 3 PM
On Monday - Wednesday, 7/20-7/22, a second crew will reinstall sidewalks within RT. 140 (West Central Street). The work will be contained within the southbound lane from Burger King to Beaver Street. During this time, lane closures will occur as needed on this section of RT. 140. Please use caution when traveling in this area and follow all posted signs.
For additional details on the project, visit the project page - https://ma-franklin.civicplus.com/557/Beaver-Street-Interceptor-BSI-Project
