Saturday, October 24, 2026

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, Oct. 26 through Friday, Oct. 30

Grove St (Rt. 140 to Beaver St) Road Closure Alert: 
Monday (10/26) and Tuesday (10/27) 7 AM to 4 PM

Beaver Street Interceptor (BSI) Project: Construction Updates ~ Monday, Oct. 26 through Friday, Oct. 30
Monday (10/26) and Tuesday (10/27) between 7AM and 4PM, the contractor will work on sewer main installation in the area of 20 Grove St.  During this time, Grove St. will be closed to all traffic in both directions. Traffic will follow detour signs on Beaver St. to Rt 140.  Local traffic only will be permitted beyond the road closed signs. Please use caution when traveling in this area and follow all posted detour signs.

Beaver St. (Rt. 140 to Grove St) Road Closure Alert: 
Thursday (10/29) and Friday (10/30) 7 AM to 4 PM

Thursday (10/29) and Friday (10/30) between 7AM and 4PM, the contractor will work on sewer main installation in the area of 275 Beaver St.  During this time Beaver St. will be closed to all traffic in both directions. Traffic will follow detour signs on Grove St. to Rt 140.  Local traffic only will be permitted beyond the road closed signs. Please use caution when traveling in this area and follow all posted detour signs.