Annual Report 2012: DPW - Engineering

The Department of Public Works is organized into several divisions. Each of their sections in the Annual Report will be published separately to allow for better reading.


Engineering Department

During the fiscal year 2012 the Engineering Department managed a very active Capital Improvement Project schedule to the town’s infrastructure. Capital Improvement Projects substantially completed this past year include:

  • Anchorage Road roadway and Storm Drain System.
  • Emmons Street, Dean Avenue, Depot Street and Ray Street Roadway and Storm Drain System.
  • Partridge Street Culvert
  • East Central Street Water Main
  • Wilson Road Culvert
  • Daniels Street Roadway
  • Partridge Street Roadway
  • Mill Street Roadway
  • Summer Street Roadway
  • Lockewood Drive Detention Pond Upgrade
  • High Ridge Circle Detention Pond Upgrade


The Engineering Department completed inhouse design drawings and specifications for the following projects:


  • East Street, West Street, Nason Street, Walnut Avenue and Church Street. Water line and Roadway Reconstruction.
  • Crescent Street, Garfield Street, Martin Avenue and Charlotte Court water line and roadway reconstruction.
  • Miller Street, Green Street and Wyllie Road Storm Drainage System 
  • Wilson Road Culvert
  • High Ridge Circle Detention Pond Rehab


Capital Improvement Projects currently under construction or out for bids include:

  • East Street, West Street, Nason Street, Walnut Avenue and Church Street water line and roadway reconstruction.
  • Crescent Street, Garfield Street, Martin Avenue and Charlotte Court water line and roadway reconstruction.
  • Miller Street, Green Street and Wyllie Road Storm Drain System
  • Sanitary Sewer Rehabilitation Phase IV
  • Greensfield Road Roadway
  • Evergreen Drive Roadway
  • Riverside Drive Roadway
  • Overlook Drive Roadway


At the end of the fiscal year, the department included the following staff.

  • William Yadisernia, P.E., Town Engineer
  • Michael Maglio P.E. Assistant Town Engineer
  • Warren Groth, Engineering Assistant
  • William Wenners, Construction Inspector


The Engineering Department has completed construction for the three-storm water treatment system upgrades included in a $131,000 grant from the U.S. Environmental Protection Agency. The projects include construction of an infiltration basin on Panther Way and upgrades to the existing detention ponds on  Lockewood Drive and High Ridge Circle. These storm water retrofits are designed to improve sediment removal, phosphorous nitrogen reduction and will significantly increase groundwater recharge to our drinking water aquifers and will improve base flow to the adjacent streams and rivers.

The Engineering Department completed the design of storm drainage improvements at the intersection of Miller Street and Green Street and at the end of Wyllie Road. These storm drain improvements are part of a DEP and EPA grant. They are designed to improve sediment removal, phosphorous and nitrogen reductions and will significantly increase ground water recharge to our drinking water aquifers.

The Engineering Department has its own experienced Resident Engineer Staff that inspects and monitors Capital Improvement projects resulting in a significant cost savings to the Town of Franklin.

In addition to the listed highlighted public projects, the division was involved in many other projects and provided engineering services to other Town departments, boards, and entities. These services include mapping, surveying, and preparation of conceptual designs, property research, cost estimating, developing charts/graphs, and review of contracts.

The Engineering Department provides technical reviews of all proposed new private commercial projects and residential subdivisions and submits recommendations to the Town Council, Planning Board, Conservation Commission and Board of Appeals.

The Engineering Department conducts preconstruction conferences with commercial and residential developers and provides construction inspections and bond estimates for completion of the work.

Respectfully Submitted,

William Yadisernia, P.E.
Town Engineer

-----

The first section of the DPW Annual Report can be found here
http://www.franklinmatters.org/2013/01/annual-report-2012-dept-of-public-works.html

Additional information on the DPW activities can be found on their webpage http://franklinma.virtualtownhall.net/Pages/FranklinMA_DPW/index


Published by the Town Clerk, this comes from the 2012 Annual Report
http://franklinma.virtualtownhall.net/Pages/FranklinMA_Clerk/annual/

"We have to make another attempt"

One of the important discussion items on the agenda of the Town Council meeting was the presentation by Jim Dacey, the Treasurer/Collector. The Milford Daily News gets around to reporting on that section of the meeting that you read about here already.
"The next treasurer/collector should not be decided by who has the most signs, biggest newspaper ads, and most people standing at the polls during Election Day, handing out trinkets," said James Dacey. "I was elected. That’s how I got the job. But after being here 13 years, I’ve seen the job evolve tremendously." 
Most of the towns that surround Franklin appoint their treasurer/collector, Dacey said. He said the towns that do not, tend to have relatively small populations. 
At present, the only qualifications to run for treasurer/collector are that the candidate be at least 18 years old and live in Franklin.
Read more: http://www.milforddailynews.com/news/x1503807295/Franklin-treasurer-collector-wants-position-to-be-appointed#ixzz2IzAReCxo

Franklin DPW: Winter Road Treatments and Snow Removal Plan

The presentation on the Winter Road Treatment or Snow Removal by the DPW at the Town Council meeting can be viewed here. DPW Director Robert Cantorregi and Carlos Rebelo, Highway Superintendent delivered this presentation and answered questions.

My notes from Weds will be updated to include a copy of this presentation




Office Hours: Rep Jeff Roy

Rep Jeff Roy will be holding his first office hours in Franklin and Medway.


  • Tues, Jan 29th - 6:00 PM at the Franklin Municipal Bldg, Room 106
  • Tues, Feb 5th - 8:00 AM at the Medway Municipal Bldg, 2nd Fl


Additional details can be found in the notice shown below:



MassBudget: analyzing the Governor's budget



MassBudget    Information.
   Participation.
 Massachusetts Budget and Policy Center    Democracy.
Budget Monitor
Yesterday, the Governor filed his budget proposal for FY 2014. Our new Budget Monitor shows how the Governor's budget would affect core programs in state government, from health care and education to public safety and the environment--including information on tax revenues.

This Budget Monitor expands and updates our analysis of the Governor's major proposals to increase education funding, repair and improve our transportation system, and raise new revenue. It also describes:

  • The first funding increase for Local Aid in five years

  • Limitations on funding for--and access to--emergency shelters, connected to the Governor's broader effort to move people towards permanent housing

  • Changes to Health Care programs as a result of the "Affordable Care Act"

Read Our BUDGET MONITOR


The Massachusetts Budget and Policy Center (MassBudget) produces policy research, analysis, and data-driven recommendations focused on improving the lives of low- and middle-income children and adults, strengthening our state's economy, and enhancing the quality of life in Massachusetts.

MASSACHUSETTS BUDGET AND POLICY CENTER
15 COURT SQUARE, SUITE 700
BOSTON, MA 02108
Twitter Facebook




Massachusetts Budget and Policy Center | 15 Court Square | Suite 700 | Boston | MA | 02108

Franklin Library: Krafty Mondays

Sent to you by Steve Sherlock via Google Reader:

via Franklin Public Library by Franklin Public Library on 1/24/13



Things you can do from here:

Thursday, January 24, 2013

Annual Report 2012 - Dept of Public Works (DPW)


The Department of Public Works provides a wide range of services to the residents of Franklin. It is organized into seven (7) Divisions:
1. Administration
2. Engineering
3. Highway and Grounds (including Highway Maintenance and Construction, Central Motors, Snow and Ice Control Parks, Town and School Grounds Maintenance and Forestry/Insect Control)
4. Water (including ground water withdrawals, water treatment and distribution)
5. Sewer
6. Solid Waste and Recycling (including the operation of the Beaver St. Recycling Center)
7. Street Lighting

1. DPW ADMINISTRATIVE DIVISION
The major functions of the Administrative Division include developing capital projects, long range planning, intergovernmental relations and compliance, grant writing, processing various private construction permits, drain layer licenses, purchasing, budgeting, accounting and payroll, and multiple forms of utility billing.

Capital Projects
The Administrative Division in conjunction with Engineering and the operating divisions develop major capital projects.

The PWED (Public Works Economic Development) portion of the downtown project (Depot, Emmons and Dean Streets was completed in the Fall of 2011. The project provides a glimpse of the type of work planned of the downtown corridor.

The design of the downtown corridor continued throughout the year. The object of this work is to improve traffic flow through the downtown area and create an area that expands pedestrian access and is business friendly. This project will provide two-way traffic on Route 140 and will include the burying of utilities, period lighting, planters, sidewalks, brickwork, curbing and parking improvements in addition to an improved transition with Dean College. A major design milestone, the 25% public hearing was held in June. It is anticipated that this work will commence Summer 2013.

Although there is limited State and Federal funding, design work continues on Pleasant and Lincoln Streets, and survey work was undertaken on Grove Street. The DPW continues to design and construct long-range projects over the next three to four years. Progress on specific capital construction projects is outlined in subsequent portions of this report.

It is important to note, that many of these projects are performed by existing staff members and save significant amounts of money by avoiding the need to contract out these services. The process of planning, designing, permitting and constructing these projects is an arduous task that requires a great level of coordination and cooperation between DPW divisions and other state, municipal and federal departments.

Grant Writing
The Town received a $20,000.00 grant to offset the cost associated with the purchase compactors to increase the recycling rate at the Beaver Street Recycling Center.

Much of the credit for the Town’s success in obtaining highway funding and other grants goes to the Town’s legislative delegation, including Rep. Jim Vallee, Sen. Scott Brown, Sen. Karen Spilka and Congressmen James McGovern.

Permits and Long Range Planning
The Town of Franklin, along with the towns of Bellingham and Milford, were the only three communities in the Commonwealth of Massachusetts placed under a Residual Designation Authority (RDA) by the Environmental Protection Agency (EPA) to mitigate phosphorus loading in the Charles River Basin. It is estimated the Town of Franklin may need to spend upwards of $135 million to implement all the measures that EPA feels would be required to meet phosphorus reductions.

DPW staff members have been working in conjunction with the Towns of Bellingham and Milford, State and Federal officials in conjunction with private land owners and business representatives to oppose this action based upon the unnecessary economic hardship it would create for the community. The EPA has  acknowledged our concerns and we continue to wait for a final permit. The Town of Franklin also continues to oppose the implementation of the National Pollutant Discharge Elimination System (NPDES) Phase II and pending Phase III Storm Water Permit for Municipal Separate Storm Sewer Systems (MS4) as required by the EPA. Phase II required the Town to highly regulate and monitor storm water throughout the Town at a
significantly increased cost. Phase III is projected to include increased regulatory requirements and cost even more. The Department will continue to refine and improve adopted regulations and practices to improve the Stormwater in Franklin while minimizing the associated costs.

Long range planning is critical in the area of Public Works and must be accomplished consistently in order to ensure that the Town water, sewer and roadway infrastructure can support the needs of our residents. The Town Master Plan, 1993 Water Distribution System Study, Sewer System Evaluation Study and the Sewer System Master Plan studies have provided detailed and valuable information that is used to steer our  construction and capital planning efforts.

In October 2001, the DPW commissioned an update to the 1993 Water System Master Plan. This plan identified approximately $40M in water system needs from which a 20 year, $20 million dollar (20/20) plan was devised for improvements. The 20/20 plan allowed the Town to address the most critical needs identified within the system study. With 20/20 funding executed, the Town Council authorized additional funding for water line replacement and the improvement of roadways on sections of Lincoln, East, West, Daniels, Summer, Lewis, Cresent, Anthony, Carmine Streets and Conlyn Ave. This work will commence next year and is expected to be completed within the next four years.

The DPW has continued to work with both DEP and the Massachusetts Department of Recreation and Conservation to facilitate the final closing and capping of the Beaver Street Landfill Site. The Town of Franklin has continued to work with other area Towns and conservation groups towards insuring that regional water supplies are protected.

Solid Waste and Recycling Collection Program
The single stream automated solid waste and recycling program was successfully implemented. This program has been extremely successful in reducing costs, improving recycling rates and providing greater convenience for users. Additional improvements have been made to the Beaver St. Recycling Center by allowing the acceptance of additional recyclable materials.

Hails and Farewells
With all the losses of the previous year, the DPW was able to hire three new employees to work on the “Crew”. They include Mr. Tony Brunetta (Highway), Mr. Jacob Standley (Grounds) and Mr. Derek Adams (Grounds). All three gentlemen were raised in Franklin and have been an excellent addition to the Department. Additionally, Mr. Michael Maglio was hired as the Assistant Town Engineer.

With gains, there are always losses. This year was once again a difficult year for the DPW; many outstanding employees retired or pursued other job opportunities. All these employees were a pleasure to work with and will be sorely missed.

Mr. Antony Mucciarone worked for the Department for over 36 years! Starting as summer help, Tony finished his career as the Deputy Director of Operations. He spend the majority of his time in DPW as the Water and Sewer Superintendent where he was considered a leader in field. I personally cannot thank Tony
enough for all support and mentoring.

“Hollywood!” Ms. Faith Falarity worked for the Town of Franklin for 20 years. She held a myriad of positions in Town working in the Treasurer’s Office, Human Resources and Recreations and finally Public Works and her kindness and wit will be missed by all.

Mr. James Esterbrook, the GIS manager who worked for the Town for almost four years is pursuing career enhancement opportunities in the private sector. His youth and willingness to assist will be greatly missed. I want to thank all of them for their years of service and wish them success in their retirement and/or all future endeavors.

Thanks
As the Director, I as always owe many thanks to my staff that make this whole department work and serve all residents in a timely manner. Everyone is committed to providing extraordinary service to the Town in the most cost-effective manner possible.

The Town Engineer Mr. William Yadisernia, Office Manager Mrs. Linda Feeley, Deputy Director of Operations Mr. Deacon Perrotta, Highway and Grounds Superintendent Mr. Carlos Rebelo, and Engineering Aide Mr. Warren Groth are all dedicated professionals that put in so much extra time and effort to make this Department a success. The Town and I are very fortunate to have such talented individuals
to work with.

I would also like to thank, Paula Juarez, Sandy Wedge, and Lynn Marchand who support the Administration Division. These individuals respond quickly and with courtesy to thousands of requests for assistance and information throughout the year.

Continued thanks go to Mr. Christopher White, the Town’s Solid Waste Coordinator. Even though his position is a part time one, he gives his heart and soul and spends much of his personal time to insure that the solid waste and recycling program is a success.

I would especially like to thank the “Crew” and the mechanics that work out of the DPW garage. These are the ladies and gentlemen that are not always seen but provide the day-to-day services that are all too often taken for granted. They pump, treat and deliver safe drinking water, they care for parks and ball fields, and they maintain the roadways, repair and sustain all Town and School vehicles and handle all our wastes. They are always available, day and night, working long hours to assist in any emergency situation whether it is snow removal, water breaks, sewer backups, wind/lightning storms, flooding and many others. They are all
extremely professional and dedicated to their jobs. I cannot thank them enough.

Respectfully submitted,

Robert A. Cantoreggi II
Director of Public Works

Linda Feeley
Office Manager


Additional information on the DPW activities can be found on their webpage http://franklinma.virtualtownhall.net/Pages/FranklinMA_DPW/index


Published by the Town Clerk, this comes from the 2012 Annual Report
http://franklinma.virtualtownhall.net/Pages/FranklinMA_Clerk/annual/

Johnston.: Saving Ben Franklin’s money

Sent to you by Steve Sherlock via Google Reader:

via Wicked Local Franklin Opinions RSS by James C. Johnston Jr./Local columnist on 1/23/13

Last week good Old Ben Franklin had another birthday. Ben was born right here in Massachusetts some 307 years ago this 17th of January at his father's house on Milk Street in Boston.  Ben was careful when it came to spending his money. Consequently, by the time of his death in 1790, he was reputed to be the richest man in the United States. In his will, Franklin set up a self perpetuating trust so that he could control his assets for the next 200 years. But even Franklin knew that two centuries were long enough to control his assets after his death. So, he arranged to dispose of his fortune by a final disbursement of it two centuries after his passing.

Things you can do from here:

Town Council - 01/23/13

The Town Council meeting on Wednesday, Jan 23 took about 90 minutes to cover the scheduled agenda. They approved the first phase of the capital plan for FY 2013. They added a license for hotels to serve liquor so that existing hotels here in Franklin can do so. The received an update on the snow plowing plan and priorities and had some discussion around the experience some councilors have had in comparison with other communities.

Treasurer/Collector Jim Dacey made a pitch for putting the Treasurer/Collector position back before the voters to have it an appointed position rather than via election (as it is today). He said: "this is not about appointing me for the next term, this is about appointing the next person to this position."

Franklin Treasurer/Collector tools over the years

In this picture, the ledger (small black book on top) is one used in 1877 by the Treasure of Franklin at that time. The larger book (with the red binding) was used by Jim Dacey during 2000 before he switched to Excel spreadsheets. The laptop (on the bottom) is the current tool for the Treasurer as it provides access to the Excel spreadsheets and to the online software used to report Franklin's finances to MA and the IRS

The presentation documents for both the Snow Plan and the Treasurer/Collector will be added as soon as they are available

The details from the meeting can be found in the links below by section of the agenda.



The DPW Presentation document was added to the Snow Removal Process link and also posted here
http://www.franklinmatters.org/2013/01/franklin-dpw-winter-road-treatments-and.html


In the News: students thrive, capital plan



Franklin High gets input from community

Local business leaders on Wednesday morning took part in a more than hour-long forum guided by this prompt: "students thrive at Franklin High School when…"


Franklin Town Council authorizes FY2013 capital improvement plan

Town Council on Wednesday night approved a capital improvement plan for fiscal 2013.
Note: the capital plan is only one item on the agenda for the meeting that lasted about 90 minutes. For all the notes on what occurred during the meeting check out the reporting here


College student season ticket packages on sale now

For college students at Dean and living in and around Franklin, this is a good opportunity to see quality soccer and get inside Gillette Stadium for less money than a Patriots ticket costs!


Sent to you by Steve Sherlock via Google Reader:



FOXBOROUGH, Mass. – The New England Revolution college student season ticket package is now available for purchase. Available only to students with a valid college ID, college student season ticket holders will receive special benefits including their own section at Revolution home games.
For $99, the 17-game package includes one ticket to every regular-season home game, a limited edition college student season ticket holder adidas t-shirt and the ability to purchase tickets for international games before they go on sale to the general public.
Read More

Things you can do from here:

State warns drivers to stop using breakdown lane where fourth lane has been ...

Sent to you by Steve Sherlock via Google Reader:

via Wicked Local Franklin News RSS by Staff reports on 1/23/13

State Police and the Massachusetts Department of Transportation are reminding drivers that use of the breakdown lane on Interstate 93/Interstate 95 (Rte. 128) has been discontinued where a new fourth travel lane has opened.

Things you can do from here:

Wednesday, January 23, 2013

Live reporting - closing

K. TOWN ADMINISTRATOR’S REPORT 

Water works associate, David Allard recognized by his peers
We have two vehicles in the DPW that

Brutus being recognized by the Charles River Water Association
leading the charge on storm water management

Governors budget comes out, will proceed cautiously until things are a little firmer
we do need to fix roads and bridges and fund schools

L. OLD BUSINESS 
none

M. NEW BUSINESS 
discussion on appointment of the Treasurer

N. COUNCIL COMMENTS 
Kelly - condolences to the DiBaggis family

Powderly - anonymous letter regarding smoking, jurisdiction falls under the Board of Health and not the Town Council

Pfeffer - many of us received a letter from resident on Ledge St
Nutting - was out there Saturday, will make temporary repairs when the weather allows, I did not receive the letter until Tuesday but did reply to him today

Bissanti - I have the advantage of googling , it is more expensive and more effective than rock salt

Roy - House budget due in April



O. EXECUTIVE SESSION
Negotiations, Litigation, Real Property, as May Be Required 
not needed


P. ADJOURN 

Live reporting - Legislation


J. LEGISLATION FOR ACTION 
1. Resolution 13-01: Appropriation – Capital FY 13 
motion to approve $1.5M from free cash to the capital improvement
passed 9-0

Nutting - taking this is phases to cautiously approach the budget situation overall
these are matters of replacing vehicles and fixing roads
$24K taken off from the Library as the Friends of the Library offered to donate that

Powderly - no text books?
Sabolinski - no, due to the changes at the state level, the text book companies haven't quite caught up to what the standards are so we weren't ready to invest in that now. There are a lot of changes coming, all new science standards coming next year. We want to wait and see


2. Resolution 13-02: Appropriation – Sewer Enterprise Capital FY 13 
motion to approve, passed 9-0
big item here is to replace the pump filters to keep the swifters out of the works


3. Resolution 13-03: Appropriation – Water Enterprise Capital FY 13 
motion to approve, passed 9-0
replacement of generators at pump stations, part of a regular replacement process


4. Resolution 13-04: Appropriation – Water Enterprise Water Lines FY 13 
motion to approve, passed 9-0
continues the successful program, Brook to Daniels, Lewis St, and we are trying to figure out of we can get the rest of the neighborhood at the same time
the streets all have low ratings, all have old pipes, this is our best estimate of marrying the water work with the road surface work


5. Bylaw Amendment 13-699:Amendment of Service Fee Rates: Administration- 2nd Reading 
motion to approve, passed 9-0
addition of the inn holder all liquor license fee, $3,000
we currently don't have this and at the request of our hotels, vote via roll call, unanimous



Live reporting - Snow removal process

Brutus Cantoreggi, Director Public Works and Carlos Rebelo, Highway Superintendent delivered this presentation and answered questions.

Note: the presentation doc was added after the meeting






Budgeted for $378 for this year

$277K spent thus far

salt distributed at 100%

Cost of salt has varied over the years

Sand is a problem when mixed with the salt as it affects our storm water
$80 a ton to get rid of, exceeds the DEP standards for MA

salt as a component is in our water system

5 truck route vs. 'treating the whole town'
$6,810 vs. 23,400

35 pieces of equipment on the road
DPW workers cost $1237.50 per hour  vs contractors at $7450.00

The goal slide is important

aggressive goal to have roads ready 4 hours after snow fall ends!

6" snow = $100K

Reimbursement of $40 for mailbox

Kelly - you don't live in town so how do you find out how to plow the streets
Cantorregi - we have a relationship with the Police, they are on the roads, they'll let us know. I do live in Millis but only 6 miles away. I could live in Franklin and live farther from the office

Kelly - how did you do the switch during the last storm
Cantorregi - sanding trucks are also plows, they tend to come back to refill anyway, they also started out, came back to switch to the plows and while the snow came down a couple of inches in the hour, the trucks went to plow also hitting the road with every other person trying to go somewhere

Dellorco - it took me 20 minutes to get
Cantorregi - we didn't scrap, we salted, it was snow to ice to rain

Dellorco - is there any reason the other towns are better than we are
Cantorregi - I got be honest, i have never heard that others are better than us. I do err on the side of caution when it comes to spending money. I work with the Police, I work with the Schools. We can set different standard, MassDOT has a higher standard. Will no one ever have an accident, no. One accident is too many

Mercer - do you change a priority when schools are going to be open?
Cantorregi - no, our priority is the priority, with school is out, then that is huge for us as it takes so many off the roads

Bissanti - is that typical for how others work?
Cantorregi - yes, 

Nutting - we have a narrow window of opportunity to make a decision, that is the worse time for us to make a decision

Sabolinksi - yes, there is collaboration among the surrounding towns, the last storm the only one delayed was Bellingham. When we spoke there wasn't a lot of snow. It takes about 10-15 minutes to get the message out, the buses are rolling at 6:00 AM. I was driving around to see for myself what the status was. Regionally we all came to the same decision.

Bissanti - how do you feel it being your call?
Sabolinski - the decision for delaying school has an economically impact on our families. You want to weigh safety but you also need to consider the costs, it can extend the school year.

Dellorco - you shouldn't have to drive around?
Sabolinski - we have to get in 180 days before the end of the fiscal year, if we get short, we have to look at other options, i.e spring vacation.

Bissanti - a delay is not canceling school?
Sabolinski - no, a delay is not canceling school.

Cantorregi - we wait until there is moisture on the road so when we put the salt out, the snow helps to hold it down. If we use snow blowers, it can pick up a newspaper and clear the shear pin