Monday, December 17, 2012

Real time reporting: Franklin TV

Public Hearing 
23 Hutchinson St (proposed Franklin TV location)

Use changes from retail to educational to do video and TV broadcast production

questions raised
on the request to reduce from 20 to 16 parking spaces (20 per zoning use required)
no site plan for dumpster (what is needed?)
what about drainage mitigation for the existing parking? (assuming there is guidance around the reduction asked (from 20-16) then, they would come back with a mitigation plan for the existing impervious surface)

Brief overview of the future plans for the studio, development from the Comcast studio, broadcasting this meeting and other events, the studio would allow for video production on site; 15 ft ceiling required for lighting the studio. Construction likely to begin summer/fall of 2013, shouldn't be long to put up

some clarification questions from a couple of neighbors on traffic (minimal), position of building (the addition will abid by the current zoning set back requirements), height of the building (less than 2 stories), potential noise (sound proofing for recording purposes), use technically as 'office' but designated as educational use, only this one use for the building
straw poll indicates approval of reduction in parking spaces with mitigation of storm water runoff

hearing continued to Jan 7th, 7:30 PM

3 minute recess