Friday, July 26, 2019

"estimated delays will be reduced by 91 percent"

From the Milford Daily News, articles of interest for Franklin:

"The state’s preferred design for the reconstruction of the troublesome Interstate-495-Mass Pike interchange eliminates weaving that often causes bottlenecks and crashes at the existing junction.

State transportation leaders unveiled the preferred project design at the first of four public information meetings at Hopkinton Town Hall on Thursday. The design includes designated ramps and lanes for each traffic maneuver to make getting off the highway and merging much safer.

The interchange is known for significant traffic during peak hours, weekends and summertime. It also has a high crash rate. More than 75,000 vehicles pass through the junction each day. More than 450 crashes – including two fatalities – occurred there between 2011 and 2015. Joseph Cahill, a consultant on the project, estimated a crash occurs there once every three or four days.

“We’re significantly improving the safety of the interchange,” said Cahill."

Continue reading the article online (subscription may be required)
https://www.milforddailynews.com/news/20190725/state-officials-unveil-preferred-design-for-overhaul-of-i-495-mass-pike-interchange

For more info on the project visit their webpage
https://www.mass.gov/i-495i-90-interchange-improvements

There is an interactive map for comments
  https://wikimapping.com/wikimap/I495I90.html


an interactive map
an interactive map

No comments:

Post a Comment